Location:

Kibali Gold Mine, DRC

Completed:

June 2023

Client:

Kibali Gold Mine

Designed by:

Traminco Design Team

"New Airport Runway" - The construction of a high-performance runway demands precision engineering to ensure aircraft safety and operational efficiency.

A full-length runway engineered for heavy cargo and passenger aircraft, featuring geotextile-reinforced base layers, precision grading, and advanced drainage to withstand DRC’s rainy seasons.

The construction of a high-performance runway demands precision engineering to ensure aircraft safety and operational efficiency.

Preparation Phase

Site Analysis: Soil bearing tests, hydrological surveys, and subgrade evaluation.

Design Phase: Collaboration between civil, geotechnical, and drainage engineers.

Technical Characteristics

Height: 1,800 m × 45 m

Materials: 250 mm asphalt over 600 mm compacted granular base

Sustainability: Subsurface interceptor drains and perimeter culverts

Construction Technology

Foundation: Lime-cement stabilization of subgrade.

Frame Construction: 3-layer asphalt laydown with electronic grade control pavers.

Facade Installation: Grooved surface for improved skid resistance.

Benefits to Society

Economic Impact: Enables large-scale gold transport, boosting mine logistics.

Public Amenities: Meets ICAO standards, reducing runway excursion risk

Sustainability: Opens DRC interior to new passenger and cargo routes

Recent Projects

all Projects

Ready To Get Started? Let’s Talk To Us Today

With over 20 years of expertise, we’ve perfected turnkey Transportation, Mining, and Construction solutions—delivering safety, quality, and reliability.