Location:
Goma, DRC
Completed:
December 2022
Client:
MPC - Goma
Designed by:
Traminco Engineering Team
This integrated facility combines advanced waste management capabilities with comfortable worker accommodations and aviation access. The project was designed to meet stringent environmental standards while providing essential infrastructure for remote operations. The helicopter pad ensures quick access and emergency evacuation capabilities for personnel in this challenging location.
Site Assessment: Comprehensive environmental and geotechnical surveys of the remote location.
Regulatory Compliance: Ensuring all designs meet national and international environmental standards.
Community Engagement: Working with local communities to minimize project impact.
Treatment Capacity: 500 cubic meters of waste processed daily.
Camp Facilities: Accommodation for 150 personnel with dining, recreation, and medical facilities.
Helipad: 30m diameter pad capable of handling medium-sized helicopters.
Materials: Corrosion-resistant materials for harsh environmental conditions.
Modular Construction: Pre-fabricated components for rapid assembly in remote locations.
Waste Processing: Advanced biological and chemical treatment systems.
Energy Systems: Hybrid solar-diesel power generation for reliable operations.
Water Management: Closed-loop water recycling systems to minimize consumption.
Environmental Protection: Prevents contamination of local ecosystems from industrial waste.
Local Employment: Created jobs during construction and ongoing operations.
Safety Enhancement: Helicopter access improves emergency response capabilities.
Knowledge Transfer: Training local workers in advanced waste management techniques.
With over 20 years of expertise, we’ve perfected turnkey Transportation, Mining, and Construction solutions—delivering safety, quality, and reliability.