Location:
Gatuna–Kigali Corridor, Gatuna
Completed:
October 2021
Client:
Gatuna Mining Company
Designed by:
Traminco Design Team
A comprehensive rehabilitation converting the existing gravel route into a CBR-stabilized base with a 150 mm asphalt overlay, alongside a 150-bed modular construction camp complete with workshops, clinic, and dining facilities.
Site Analysis: Pavement condition surveys, CBR testing, and traffic volume forecasting to establish design parameters.
Design Phase: Collaborative planning for pavement structure and camp master layout, integrating utilities and access roads.
Pavement: 150 mm asphalt concrete over 300 mm cement-treated base course.
Camp Facilities: 150-bed dormitories, medical clinic, maintenance workshop, mess hall, and power generation unit.
Base Stabilization: In-place cement mixing using precision spreaders and re-rollers for uniform treatment.
Asphalt Works: Three-layer electronic grade-controlled paving with tandem and pneumatic rollers for optimal compaction.
Camp Assembly: Precast concrete modules and rapid-deploy MEP systems for accelerated commissioning.
Improved Access: 30 % reduction in travel time for local communities and freight.
Economic Growth: Enhanced corridor supports mining logistics and cross-border trade.
Social Impact:Camp facilities provided medical outreach and vocational training programs for local residents.
With over 20 years of expertise, we’ve perfected turnkey Transportation, Mining, and Construction solutions—delivering safety, quality, and reliability.